Equipment Details |
Details |
Building Design Concept |
The project has been envisaged as a CAMPUS development with 4 buildings spread inside a vibrant green. The built up masses to follow the keywords of designing "INSIDE OUT". The design aim at creating an active environment that caters to the needs of the occupants. The aim is to harmonically stitch all the buildings together, accentuating the Campus feel.
Optimal size floor plates and the overall objective is to create a building that has a futuristic approach with an open and intelligently planned environment. |
USP of Floor Plate design |
PT slab system with Capitals |
Floor Loading |
Block A&B: live load 400kg/m2 Block C&D: live load 300 Kg/m2 |
Type of Chillers |
Centrifugal Chiller |
Make of Chillers |
Carrier |
Chiller Capacity |
3x 720 TR(Water Cooled)+2x320 TR(Air-Cooled) |
USP of Chillers |
iKW/TR: 0.63 |
AHU Make |
Waves/Suvidha |
DG Sets Configuration |
8 x1500 KVA(HT) |
DG Sets Make |
Sudhir |
Air Filtration System in Common Areas |
AHU for Corridor Air-conditioning, MERV-8 filter is used. |
Air Filtration System in Tenant Space |
Tenant Area AHUs have MERV-8 filter. |
ASHRAE Standard Ratings |
HVAC system designed as per ASHRAE. |
Glazing |
Double Glazed |
Façade USPs |
- Punched windows with minimal curtain glazing
- The punched windows to be single glazed.
- An attractive amalgamation of Glazed facade and Fittings creates an interaction between the interior and external designs and elements
- Minimal stone cladding
- Most of the surfaces of each building to be textured paint finish.
- The interactive space between all the blocks THE DECK creates an architecture user friendly interactive space which culminate an aesthetic and architecture features of facade connect through each other
|
Well Being Measures |
- Fresh air is being provided as per ASHARAE 5 CFM per person+ .05 CFM per Sq.ft.).
- MERV-8 Filter provided in AHU.
|
Rain Water Harvesting |
Provided 4 Nos. Rain water harvesting pit and 4 Nos. Rain water recharge pit |
Zero Discharge Building |
Yes, STP recycled treated water used within building |
Water Conservation Measures |
Yes, recycled treated water used for horticulture, flushing, HVAC cooling water, used water saving fixtures and flushing |
Energy Conservation Measures |
- 1. High Efficiency Chiller iKW/TR 0.63
- 2. Premium efficiency Motor: IE2
- 3. Use of LED lighting
|
Lifts (Make, Capacity and Speed) |
- Block A & B- Kone -17 pax- @ 1.7m/sec speed
- Block C & D- Hitachi-17 Pax- @ 1.7m/sec speed
|
USPs for Lifts |
All cabin car walls of SS make with 900 mm hand grab bars. With an aesthetic culmination of SS metal & Lift lobby, creates a mood and feeling of design and aesthetics. |
Security Layers and Systems for common areas |
- Access Control system (All basement lift lobby: access card control and ground floor: Flap Barriers /turstile with electronic card swipe)
- Manned Security (Check posts at key locations within the complex)
- Boom Barrier (at basement entry and exits) and
- CCTV Surveillance (Main Entrance, Main Lift Lobby, Basement Lift Lobbies / Ramps & Staircase Exit)
-
|
Air Conditioning System |
Water Cooled Chiller System+ Air Cooled Chilling(Partial) |